GE Healthcare Tool Installation East Greenbush, NY

Description

Hodess was the design-build cleanroom contractor for Turner Construction’s Bay Chase cleanroom project. GE Healthcare contracted Hodess directly for tool installation in a 40,000 sf ISO 5 cleanroom, utilizing modular 2″ and ½” aluminum wall panel systems. Additionally, Hodess constructed 16,000 sf of ISO Class 7 space with 2″ aluminum cleanroom grid and vinyl flooring. Responsible for designing and installing all process utilities for the tool installation, the project achieved its first LEED Gold certification. The design saved approximately $1M annually in energy costs by maintaining room specifications with lower airflows.

Industry

Medical Device / Microelectronics

Project Delivery

Design Assist

ISO Class

ISO 5, 6, 7

Similar Projects

Massachusetts Institute of Technology Nano Fab Tool Installation

MIT contracted Hodess for the tool installation in their NANO fab in Cambridge, MA, completed in multiple phases. The Nano cleanroom is located in…

View Project
University of Virginia Nanotechnology Cleanroom

Hodess was hired as a design-builder under a special provision of Virginia’s purchasing rules to renovate 22,630 sf of cleanroom space in the basement…

View Project
Vanderbilt University Nanotechnology Cleanroom

A new cleanroom in the University’s Center for Nanotechnology includes 8,000 sf of ISO 5 (Class 100) and 4,000 sf of ISO 6 (Class…

View Project
You have questions. We have straight answers.