ASMO NORTH AMERICA

Back to Our Work

Demolition of existing rooms, walls, floors, ceilings, HVAC equipment and electrical.

Installed conductive epoxy flooring with tight parameters.

Perimeter was 25′ high walls facing the plant and 12′ high walls along the back. Ceiling system was Gordon 1 1/2″ wire hung grid.

Installed 3′ and 6′ windows, with various windows in return walls. Included a 12′ manual sliding door, and 3 sets of interlocked sliding glass doors.

Relocated 2 electrical panels for use in the cleanroom.

Furnished and installed new humidifier, 70 ton roof top unit, a smaller condensing unit, and other mechanical equipment, as well as 3 exhaust fans interlocked with owner equipment.

Designed at Class 100,000 and certified at Class 1,000 during certification.

  • LOCATION

    Statesville, NC
  • INDUSTRY

    automotive
  • PROJECT TYPE

    Design/Build
  • ISO CLASS

    ISO 8
  • SIZE

    5,000 sf
  • PROJECT SCHEDULE

    4 months
  • PROJECT COST

    $1,000,000